Pre-planning scoping studies can determine what development (if any) is appropriate at the site. In our experience of the flood risk assessment process changes are often necessary to the site layout and building design to incorporate the mitigation features required by PPS25.
Our scoping studies can save you the considerable time and money that is involved in redesigning plans and buildings.
For further information please contact one of our experienced flood risk consultants on 01273 704464
Use our Online Quote Form
Or Call: 01273 704464